İçtaş İnşaat Sanayi Ticaret and Italy’s Astaldi consortium won the bid for a part of the Northern Marmara Highway Project, which includes a third bridge over the Bosphorus at yesterday’s tender at the Highway Authority in Ankara at 1:00.
İçtaş İnşaat Sanayi Ticaret-Astaldi Joint Venture and Cengiz İnşaat-Kolin İnşaat-Limak-Makyol İnşaat-kalyon İnşaat Joint Ventures submitted bids for the construction and management of the project. The Salini-Gülermak consortium was omitted from the tender since its proposal envisioned building the legs of bridge in the water, as opposed to land, a project pre-condition.
The initial tender had been held on April 20, where a total of four bids had been received. Mapa İnşaat was subsequently eliminated from the tender due to not having been able to achieve the required 70 points for technical sufficiency. (ANKARA – Anatolia News Agency)